In June 2024, Yunda signed a contract for the industrial packaging paper project of the Scandinavian Group of Companies in the UAE, under an EPS (Engineering, Procurement, and Services) general contracting model.
The main supply scope of this project includes:
◆ Stock preparation system
◆ Paper machine system
◆ Approach flow system
◆ Boiler system
◆ Effluent treatment system
◆ Overhead crane
◆ Detailed Engineering
As the head-contractor for this project, Yunda is not only responsible for the comprehensive planning and design of the project but also actively participates in and assists the client with the project application process with the local government in the UAE. Considering the strict requirements and high standards set by the local government in various fields, Yunda team continuously overcomes various challenges, successfully gaining the trust and recognition of the client, as well as the acknowledgment of the local government.
Currently, the project is progressing steadily and orderly.
Case
-
Yunda’s Complete Stock Preparation System for Jinlong’s 6600 mm Packaging Paper Project Enters Commissioning Stage
-
Yunda Secures Orders for Premium Tissue Paper Projects at Two Yusen Group Production Bases
-
Yunda Successfully Ships the Complete Stock Preparation System for Hengan Group’s Tissue Paper Project
-
Yunda’s Complete Stock Preparation Systems for Guangxi Xiongfu Paper’s 300,000 t/a Grayboard Paper Project Successfully Start Up
-
Yunda Wins the Full-Line Pulping Equipment Order for Qian’an Boda’s 150,000-Ton Bleached Chemi-Thermomechanical Pulp (BCTMP) Project
-
A Great Start! Yunda’s Complete Stock Preparation System Supports Successful First Paper Production on Jiangxi Zhenguan PM5
-
Yunda Successfully Starts Up Complete Stock Preparation and Approach Flow Systems for Jiangmen Renke Oasis 80,000 TPA Tissue Paper Project
-
Successful Start-Up of Taisheng Group’s Tissue Paper Project in Guizhou
-
Taisheng Group’s Tissue Paper Project in Jiangxi Successfully Starts Production
-
Sun Paper 300,000 TPA Tissue Project (Phase II) – Complete Pulping System Successfully Started Up