
In April 2024, Yunda signed a cooperation agreement for the EPS (Engineering, Procurement, and Service) of the 300 TPD duplex board project with PHP in Bangladesh. The supply scope mainly includes:
◆Complete stock preparation lines — conveying system, D type continuous pulping system, HC cleaner system, coarse screen system, fractionating screen system, fine screen system, refining system, and agitators, etc.
◆ Approach flow system
◆ DCS (Distributed Control System) and MCC (Motor Control Center)
◆ Detailed engineering
Currently, all equipment is being shipped in a tight and orderly manner. The successful signing of this project marks an important milestone for Yunda after more than 20 years of deep cultivation in the South Asian market.
Case
-
Yunda Secures Orders for Premium Tissue Paper Projects at Two Yusen Group Production Bases
-
Yunda Successfully Ships the Complete Stock Preparation System for Hengan Group’s Tissue Paper Project
-
Yunda Wins the Full-Line Pulping Equipment Order for Qian’an Boda’s 150,000-Ton Bleached Chemi-Thermomechanical Pulp (BCTMP) Project
-
Taisheng Group’s Tissue Paper Project in Jiangxi Successfully Starts Production
-
Sun Paper 300,000 TPA Tissue Project (Phase II) – Complete Pulping System Successfully Started Up
-
Yunda Provides High-Temperature Fibrillation Machine for Sichuan Jian Cen Bamboo Fiber Technology’s 100,000-Ton Bamboo Fiber Project
-
Taison Tissue Paper Project
-
Smooth Shipment of Complete Thermo Mechanical Pulping Equipment for Thailand Precise Molding Project
-
Guangxi Xiongfu Paper Project
-
Taison (Guizhou) 160,000 tons tissue paper project
