
In April 2024, Yunda signed a cooperation agreement for the EPS (Engineering, Procurement, and Service) of the 300 TPD duplex board project with PHP in Bangladesh. The supply scope mainly includes:
◆Complete stock preparation lines — conveying system, D type continuous pulping system, HC cleaner system, coarse screen system, fractionating screen system, fine screen system, refining system, and agitators, etc.
◆ Approach flow system
◆ DCS (Distributed Control System) and MCC (Motor Control Center)
◆ Detailed engineering
Currently, all equipment is being shipped in a tight and orderly manner. The successful signing of this project marks an important milestone for Yunda after more than 20 years of deep cultivation in the South Asian market.
Case
-
350,000 tpy Linerboard Project in Arkhangelsk, Russia
-
KOA Vietnam 6600/1100 Packaging Paper Upgrade Project
-
Smooth Shipment of Complete Thermo Mechanical Pulping Equipment for Thailand Precise Molding Project
-
Successful Delivery of the Refiner Repair Project Between Yunda and Guangzhou Paper Group
-
100,000 Tons Per Year Cultural Paper Project in Ethiopia
-
Taison (Guizhou) 160,000 tons tissue paper project
-
Taison Tissue Paper Project
-
Guangxi Xiongfu Paper Project
-
Jincailun Paper PM18 Cultural Paper Project
-
Rongwei Industrial’s 120,000-Ton Packaging Paper Project in Cambodia