
In April 2024, Yunda signed a cooperation agreement for the EPS (Engineering, Procurement, and Service) of the 300 TPD duplex board project with PHP in Bangladesh. The supply scope mainly includes:
◆Complete stock preparation lines — conveying system, D type continuous pulping system, HC cleaner system, coarse screen system, fractionating screen system, fine screen system, refining system, and agitators, etc.
◆ Approach flow system
◆ DCS (Distributed Control System) and MCC (Motor Control Center)
◆ Detailed engineering
Currently, all equipment is being shipped in a tight and orderly manner. The successful signing of this project marks an important milestone for Yunda after more than 20 years of deep cultivation in the South Asian market.
Case
-
100,000 Tons Per Year Cultural Paper Project in Ethiopia
-
Taison (Guizhou) 160,000 tons tissue paper project
-
Taison Tissue Paper Project
-
Guangxi Xiongfu Paper Project
-
Jincailun Paper PM18 Cultural Paper Project
-
Rongwei Industrial’s 120,000-Ton Packaging Paper Project in Cambodia
-
Lopie Paper 80,000-ton tissue paper project
-
Guangdong Dingfeng Paper PM3 and PM4 tissue paper project
-
Jiangxi Lulin’s 200,000-ton packaging paper project
-
Guangxi Qingyun Tissue Paper project