Core Equipment
In March 2025, all equipment supplied by Yunda for the Bangladesh PHP 300TPD coated white board paper project was successfully completed and shipped.
The scope of supply mainly includes:
◆ Complete Stock Preparation Line
— Conveying system
— D-type continuous pulping system
— Reject removal system
— Coarse screening system
— Fiber classification system
— Fine screening system
— Refining system
— Agitators and mixers, etc.
◆ Approach Flow System
◆ DCS and MCC Control Systems
◆ Pulp Pumps and Water Pumps
◆ Detailed Engineering Design (excluding civil engineering works)
Classic Case
-
Russia Khargi Packaging Paper Project
-
KOA Vietnam 6600/1100 Packaging Paper Upgrade Project
-
Jiangxi Lulin’s 200,000-ton packaging paper project
-
Successful Delivery of the Refiner Repair Project Between Yunda and Guangzhou Paper Group
-
Rongwei Industrial’s 120,000-Ton Packaging Paper Project in Cambodia
-
Five Continents Special Paper 450,000 tons packaging paper Project

